Morden Lane to close for Pickering culvert replacement through December 23

Source publication date: September 15, 2026
Closure dates: September 21 to December 23, 2026
Community: Pickering
Format: Official service and construction notice
Original source: City of Pickering
People mentioned: None
Verification date: September 19, 2026

Morden Lane is scheduled to close between Reytan Boulevard and Krosno Boulevard from September 21 through December 23 for a culvert replacement, according to the City of Pickering.

The work is part of the Krosno Creek Flood Reduction project. The City’s contractor is scheduled to replace the creek culvert beneath Morden Lane during the closure period.

Local and emergency access maintained

The City says emergency vehicles and local traffic will continue to have access at all times. Other through traffic should plan an alternate route for the duration of the project.

The official notice includes a service announcement and location map. Dates may be revised if construction conditions change, so residents should check the City’s page for updates before travelling.

Sources and verification

DurhamPoliticians.com read the City of Pickering notice and checked its linked service announcement on September 19, 2026. The closure limits, project purpose and scheduled dates are drawn from those official materials.

Image attribution: Original conceptual editorial illustration created for this report; it does not depict the actual event or named people.

Corrections: See an error or have an update? Contact DurhamPoliticians.com.

Scroll to Top
Powered by AllAboutWebServices.com Inc